Slope stability in surface mining
Slope stability in surface mining
$140.00 Original price was: $140.00.$32.95Current price is: $32.95. DOWNLOAD NOW
Sale!

Slope stability in surface mining

Original price was: $140.00.Current price is: $32.95.

Frequently bought together:
Slope stability in surface mining
You're watching:Slope stability in surface mining
Original price was: $140.00.Current price is: $32.95.
Original price was: $140.00.Current price is: $34.95.
Original price was: $200.00.Current price is: $44.95.
Original price was: $125.00.Current price is: $31.95.
Original price was: $164.00.Current price is: $33.95.
Original price was: $98.00.Current price is: $31.95.
Total: $32.95
  • Instant Downloads
  • 24/7 Support
  • Payments are secure and encrypted
Guaranteed Safe Checkout

As we enter the twenty-first century, mines are being planned to reach depths of more than 1,100 meters, waste rock embankments have surpassed 600 meters in height, tailings dams have reached heights of 200 meters, and heap leach facilities have topped 150 meters. The push toward higher, deeper, and steeper, along with the larger and more productive equipment in use today, continues to test our tools and capabilities.

Slope Stability in Surface Mining documents the progressive rise in technical understanding and sophistication in the field. Only be continuously collecting and exchanging information can design concepts, construction methods, monitoring strategies, and reclamation practices keep pace with the times. Slope Stability in Surface Mining creates a common platform on which to base correct, economical, and safe slope design and construction decisions.

Reviews

There are no reviews yet.

Be the first to review “Slope stability in surface mining”