Geomechanical Aspects of Abandoned Room and Pillar Mines and Remediation Measures
Geomechanical Aspects of Abandoned Room and Pillar Mines and Remediation Measures
$113.00 Original price was: $113.00.$31.95Current price is: $31.95. DOWNLOAD NOW
Sale!

Geomechanical Aspects of Abandoned Room and Pillar Mines and Remediation Measures

Original price was: $113.00.Current price is: $31.95.

Frequently bought together:
Geomechanical Aspects of Abandoned Room and Pillar Mines and Remediation Measures
You're watching:Geomechanical Aspects of Abandoned Room and Pillar Mines and Remediation Measures
Original price was: $113.00.Current price is: $31.95.
Original price was: $154.00.Current price is: $33.95.
Original price was: $105.00.Current price is: $30.95.
Original price was: $72.00.Current price is: $29.95.
Original price was: $167.00.Current price is: $37.95.
Original price was: $220.00.Current price is: $38.95.
Total: $31.95
  • Instant Downloads
  • 24/7 Support
  • Payments are secure and encrypted
Guaranteed Safe Checkout

Geomechanical Aspects of Abandoned Room and Pillar Mines and Remediation Measures addresses the occurrence, prediction, and control of subsidence issues encountered in room and pillar mining, including creep, degradation, and seismic aspects. The book distinguishes itself by:

  • Presenting a unified treatise on room and pillar mines
  • Using clear definitions and explanations of fundamental concepts
  • Considering long-term aspects (creep and degradation), seismic effects, remedial measures, contact types, and remote sensing monitoring techniques
  • Including physical and numerical modeling
  • Demonstrating an in-depth view of procedures and solution techniques

This book provides a clear understanding of active and/or abandoned room and pillar mines. It is aimed at academics and engineers with a mining and/or civil engineering background, but it also serves as a reference for undergraduate and graduate students.

Reviews

There are no reviews yet.

Be the first to review “Geomechanical Aspects of Abandoned Room and Pillar Mines and Remediation Measures”